成人性生交大片免费观看软件苹果,715824成人免费看A片,国产 成年妇 视频,欧美性生交A片免费看,国产美女裸体无遮挡免费视频网站

Press & report

Is Your Photovoltaic Power Station Ready For Summer?

The turn of spring and summer is a period of frequent strong convective weather, and the subsequent hot summer is accompanied by high temperature, heavy rain and thunder and other weather, and the photovoltaic power station on the roof has undergone multiple tests. So, how do we usually take countermeasures to ensure the stable operation of photovoltaic power plants and ensure profits?


For summer heat

1. Pay attention to cleaning and cleaning the shelters on the power station, so that the components are always in a state of ventilation and heat dissipation.

2. Please clean the power station in the early morning or evening, avoid exposure to the sun and high temperature at noon and afternoon, because the sudden cooling will cause the temperature difference of the glass plate of the module, and there may be cracks on the surface of the panel. Therefore, it is necessary to choose early morning and evening when the temperature is lower.

photovoltaic

3. High temperature may cause the aging of the internal components of the inverter, so it is very important to ensure that the inverter has good ventilation and heat dissipation conditions. The inverters are basically installed outdoors. During installation, SKYWORTH puts the inverters in a cool place to avoid direct sunlight, such as the back of the module and under the eaves. A cover plate will be added for outdoor installations to fully ensure the ventilation of the inverters. and heat dissipation.


Rainstorm for summer

A lot of rainwater will soak the cables and components, which will reduce the insulation performance. If it is damaged, it will directly lead to the inability to generate electricity.

If your house has a sloping roof, it will have a strong drainage capacity, please don't worry;

3

If it is a flat roof, frequent inspections of the power station are required. Note: During inspection operation and maintenance in rainy days, avoid electrical operations with bare hands, do not directly touch the inverter, components, cables, and terminals, etc., you need to wear rubber gloves and rubber boots to reduce the risk of electric shock.


Lightning for summer

The lightning protection facilities of photovoltaic power plants should also be checked regularly. In the current lightning protection measures, the most effective and extensive method is to connect the metal parts of electrical equipment to the ground. The grounding system consists of four parts: grounding equipment, grounding body, lead-in wire and earth.

4

Avoid repairing electrical equipment and circuits with bare hands, wear insulating rubber gloves, beware of the risk of electric shock, and take measures to prevent high temperature, rainstorm, typhoon, and lightning strikes. It should be noted that Skyworth Photovoltaic and PICC have purchased exclusive comprehensive insurance for each power station to escort the power station, and users do not need to bear the risk for damage caused by natural disasters.


FACEBOOK

  • Pre sales consultation
  • After sales consultation

customer service

Linkedin

  • Pre sales consultation
  • After sales consultation

customer service

CONTACT US

  • Pre sales consultation
  • After sales consultation

customer service

Whatsapp

return

Sweep the official account

国产AV旗袍丝袜被操 | 无码人妻精品一区二区三区麻豆 | 好爽快射在线视频 | 国产做受91 一片二 | 红桃视频A片免费观看 | 久久精品国产亚洲AV无码城中村 | 亚洲AV乱码专区国产精品 | 成人国产草莓47视频在线观看 | 1028手机看片国产白浆 | 成人在线综合欧美 | 肥胖老太婆姓爱视频网站 | 国产高清一二三区 | 岳的好大精品一区二区三区 | 欧美老熟妇又粗又大 | 黑人粗大无码A∨人妻一区 国产一级a爱做片免费观看 | 2019中文在线观看 | 懂色av蜜臀av粉嫩av分享吧最新章节 | 91av免费在线观看 | 中文字幕一级AV片 | 免费观看日批视频 | 一级AAAAA黄色视频 | 国产呻吟揉丰满无码专区 | 日本三级吃奶头添泬无码视频网站 | 色综合久久天天综合网 | av无码片在线观看1区 | 99精品成人无码A片观看金桔 | 好屌妞这里只有精品 | 少妇被躁到高潮无套内谢麻豆传 | 最好看的2019年中文字幕 | 特黄A片一级毛片免费视频蜜桃网 | 久久国产亚洲精品美女久久久久_ | 国产69精品久久久久观看黑料 | 性爱乱伦小说电影五月婷婷 | 五月激情婷婷综合网 | 国模无码视频一区二区三区哺乳期 | 爱搞igao视频 | 揭色影院百万AV影院大片 | 国产高清无码免费在线观看 | 先锋影音资源部AV扇贝 | 波多野结衣一区二区三区高清av | gogo久久精品日本无码 |